⚠ Demo data · the figures shown for Metal Warehouse are sample placeholders, not real results. Live data starts once this client's Google access is granted.
Yeah lets do the 12 ft sidewalls then. When can you deliver?
2 Hector Salinas Today 09:42 Spec sheet attached - let me know if you need the trim breakdown separately.
1 Riley Construction Group Mon 10:04 Materials list received - quoting now, will have full breakdown by Wednesday.
Tracy Boudreaux Yesterday 17:33 We can have it in stock by Tuesday next week if you need that quantity.
Boyd Hetherington Mon 16:42 Engineering drawings ready Friday - delivery scheduled for May 12.
Sounds great - sending design intake form to your email.
Picked up, looks great. Thanks!
Quote attached - earth tone is in stock, ash gray is special order 7 days.
1 Sergio Quiroga Yesterday 11:48 C-purlins and tubing in stock - delivery to Whitewright is $185.
Drawing pack en route - lead time is 4 weeks for 50x80 ag building.
Brody Linthicum Sun 16:08 Custom flashing fabricated by Wednesday, $5,750 firm.
Self-storage materials list quoted - PDF in your inbox.
Yes, engineered stamped drawings included on all kits 30x40 and larger.
Pete Hollenbeck Thu 16:42 Replacement panels in stock - $2,180 with delivery, ready tomorrow.
Lyla Gardenshire Wed 13:08 Barndo loft package quoted at $14,750 - color samples in mail.
Wholesale pricing tier doc emailed - net-30 application form attached.
2-barndo lead time is 10 business days from deposit, both shipped together.
Felipe Esquivel Sun 19:22 Full kit + erection drawings priced at $22,400 - PDF attached.
Pastor Reuben Ojeda Sat 11:42 Spring start absolutely doable - 4-6 week project after deposit.
Sent the wholesale rep packet to your work email.
1 Boyd here - circling back on the 100x200 cattle barn quote, ready to pull the trigger if scheduling works.
Fri 14:18
Boyd - great. To lock pricing we need engineering stamps for OK delivery. 5-day turn from us. Multi-truck delivery to your land?
Fri 14:44
Yes 3-truck delivery, my equipment can offload. What lead time on materials after engineering?
Fri 15:11
Materials in 2 weeks from deposit. Total project timeline 3 weeks to your site.
Fri 15:48
Perfect - sending deposit Monday morning.
Mon 09:42
Deposit received - engineering started, drawings ready Friday.
Mon 14:08
Engineering drawings ready Friday - delivery scheduled for May 12.
Mon 16:42